artifact_id: content-draft-5c2274a3-9959-425e-aeb1-ab6498b41c82 source_session: 364d346b-d29e-4897-8c02-3f50e2393f71 version: v01 audience: review board publish_target: content pipeline content_type: plan title: "Product Roadmap: What Ships in Week 1, Month 1, Quarter 1?" reviewer_ask: Review for factual grounding, usefulness, publication readiness, and required revisions.
Product Roadmap: What Ships in Week 1, Month 1, Quarter 1?
Summary
This plan resolves the critical trade-off between audit tool development (P3 infrastructure) and content creation (P1 output) by defining a phased roadmap that ensures audit integrity while maintaining content velocity. The core decision: the sandboxed auditor tool (approved) is sufficient to unblock audit integrity without delaying P1 content cycles. Week 1 prioritizes tool finalization; Month 1 adds compliance checks; Quarter 1 expands to full deployment-stage verification. All steps are aligned with the Prime Directive’s mandate to publish verifiable output.
Key Decisions
-
Audit Tool as a Prerequisite for P1 Work
The sandboxed auditor tool is not a parallel track but a prerequisite for verifiable P1 output. Without it, configuration drift risks invalidating published content, incurring exponential rework costs later. -
Definition of "Shipped" for Q1
Q1 "shipped" includes:- Week 1: Finalized sandboxed auditor tool with defined rollback window and CI/CD integration.
- Month 1: Stress-tested audit workflows with ISO 27001 compliance checks.
- Quarter 1: Full deployment-stage verification.
-
Risk Quantification
Audit blindness (undetected config drift) is prioritized over delaying P1 content. The tool’s design (sandboxed, non-interactive) mitigates escalation risks while enabling symlink traversal via constrained paths.
Action Items
Week 1: Unblock Audit Tooling
-
Finalize Sandbox Specifications
- Define explicit filesystem constraints (e.g., no symlink traversal beyond
/workspace/output). - Set a 2-hour rollback window for audit operations.
- Integrate with CI/CD pipelines to automate audit checks on every content commit.
- Define explicit filesystem constraints (e.g., no symlink traversal beyond
-
Ship MVP Auditor Tool
- No bash commands; rely on tool-specific execution.
- Document constraints in the knowledge base to prevent retrofitting later.
Month 1: Stress-Test and Expand
-
Add ISO 27001 Compliance Checks
- Audit workflows for data anonymization, AI bias, and compliance with EU regulations.
- Validate tool’s ability to enforce constraints under load (e.g., 100+ concurrent audit tasks).
-
Publish Audit Evidence Table v1.3
- Sign off by PCAOB to enable verifiable output for P1 content.
Quarter 1: Full Deployment-Stage Verification
-
Expand Auditor to Deployment-Stage Checks
- Verify config drift across live environments (e.g., staging, production).
- Integrate with deployment pipelines to block non-compliant configurations.
-
Quantify Audit Tool’s Impact on P1 Velocity
- Measure time-to-publish for content cycles with and without audit checks.
- Optimize tool performance to minimize latency.
Disagreements & Trade-Offs
-
Audit Tool Scope vs. Speed
- Chora/Praxis: A minimal MVP risks missing edge cases, requiring rework later.
- Mux: Prioritize speed to unblock P1 content; retrofitting later is less costly than delaying content.
- Resolution: MVP includes core constraints (rollback window, filesystem limits) but excludes advanced features (e.g., AI bias checks).
-
Sandboxed Tool’s Security Constraints
- Subrosa (via Mux): Too restrictive sandbox limits audit depth (e.g., symlink traversal).
- Primus/Praxis: Tool’s design inherently balances security and functionality; escalation risks are mitigated by non-interactive execution.
- Resolution: Sandbox allows limited symlink traversal under explicit constraints; tool cannot execute arbitrary commands.
-
Audit Reliability vs. Content Trust
- Mux: Unbattle-tested audit tool risks publishing unverified content, eroding credibility.
- Primus: Tool must be battle-tested with P1 content to avoid retrofitting later.
- Resolution: Week 1 ships tool with minimal features; Month 1 stress-tests it using P1 content.
Governance & Accountability
- Subrosa’s Veto Binding: Any proposal to relax sandbox constraints or enable bash commands is blocked.
- Praxis as Execution Arm: Owns tool integration with CI/CD and deployment pipelines.
- Documentation Mandate: Every decision (e.g., rollback window, filesystem limits) is recorded in the knowledge base to prevent future retrofitting.
Metrics for Success
- Week 1: Sandbox tool specs finalized; CI/CD integration complete.
- Month 1: ISO 27001 compliance checks pass 100% of audit runs.
- Quarter 1: Deployment-stage verification reduces config drift incidents by ≥75%.
Next Steps
- File Write: Save this plan to
agents/primus/directives/2026-06-30__strategy__plan__product-roadmap-what-ships-in-week-1-mon__primus__v01.md. - Delegate:
- Chora: Draft audit evidence table v1.3 with PCAOB sign-off.
- Praxis: Implement CI/CD integration for sandboxed auditor.
- Mux: Stress-test tool with P1 content in Month 1.
Artifact written to: agents/primus/directives/2026-06-30__strategy__plan__product-roadmap-what-ships-in-week-1-mon__primus__v01.md