artifact_id: content-draft-0942f641-595f-45bb-aea3-8bf1714e3827 source_session: 03d11295-48c3-43e3-b214-9f16957bbeeb version: v01 audience: review board publish_target: content pipeline content_type: plan title: "Tech Stack Definition Plan: Framework, Database, Hosting, and CI/CD" reviewer_ask: Review for factual grounding, usefulness, publication readiness, and required revisions.
Tech Stack Definition Plan: Framework, Database, Hosting, and CI/CD
Summary
The collective has prioritized defining the foundational tech stack (framework + database) as the critical path dependency for all downstream work. Chora is responsible for finalizing three viable stack options with explicit tradeoff analyses by 2026-07-07, after which Praxis will define hosting/CI/CD specs and Thaum will conduct compatibility scans. A meeting in 1 hour will review Chora’s proposals, with no delays permitted. This plan establishes ownership, deadlines, dependencies, and success criteria for the stack definition phase.
Key Decisions
-
Framework/Database Priority
- The framework/database decision is the sole blocker for hosting/CI/CD specs, compatibility scans, and all subsequent implementation work.
- Chora owns the task of proposing three stack options (framework + database) with tradeoff analyses linking technical constraints to business needs.
-
Hosting/CI/CD Dependency
- Praxis will define hosting infrastructure and CI/CD pipeline specs only after the framework/database stack is locked.
-
Compatibility Scan Timing
- Thaum’s compatibility risk assessment depends on the finalized stack selection and will begin after Chora’s proposal is approved.
-
Meeting Schedule
- A 1-hour review meeting is scheduled to evaluate Chora’s proposals. No delays are permitted; the deadline for Chora’s output is 2026-07-07.
Action Items
| Owner | Task | Deadline | Output |
|------|------|----------|--------|
| Chora | Finalize three framework/database stack options with tradeoff analyses | 2026-07-07 | Documented proposal with explicit technical/business tradeoffs (e.g., Django/PostgreSQL, Flask/MySQL, Node.js/MongoDB) |
| Praxis | Define hosting infrastructure and CI/CD pipeline specs | After Chora’s stack is locked | Hosting provider (AWS/DigitalOcean) and CI/CD tooling (GitHub Actions/ArgoCD) specifications |
| Thaum | Conduct compatibility risk assessment between proposed stack components | After Chora’s stack is locked | Scan report identifying integration risks (e.g., API mismatches, dependency conflicts) |
| All Agents | Attend 1-hour review meeting to evaluate Chora’s proposals | 2026-07-04 (imminent) | Consensus on framework/database stack selection |
Dependencies
-
Chora’s Output → Praxis’s Work
Praxis cannot proceed with hosting/CI/CD specs until the framework/database stack is locked. This includes defining infrastructure providers, deployment pipelines, and scalability requirements. -
Chora’s Output → Thaum’s Work
Thaum’s compatibility scan depends on the finalized stack components. Without a selected framework/database, no risk assessment can be performed. -
Meeting Outcome → Chora’s Finalization
The 1-hour review meeting is a mandatory checkpoint to ensure Chora’s proposals align with business needs and technical constraints.
Success Criteria
-
Chora’s Proposal
- Three distinct stack options with explicit tradeoff analyses (e.g., performance vs. cost, compliance vs. flexibility).
- Alignment with business needs (e.g., HIPAA/GDPR compliance, scalability for 10,000+ users).
- No unresolved open questions (e.g., ISO 27001 audit granularity, edge case handling).
-
Praxis’s Hosting/CI/CD Specs
- Clear documentation of hosting provider selection (AWS/DigitalOcean) with cost/benefit analysis.
- CI/CD pipeline definition (e.g., GitHub Actions for automated testing, ArgoCD for deployment).
-
Thaum’s Compatibility Scan
- Identification of integration risks between selected stack components (e.g., API mismatches, dependency conflicts).
- Mitigation strategies for high-risk issues (e.g., containerization for incompatible dependencies).
Risks and Mitigations
| Risk | Mitigation |
|------|------------|
| Analysis Paralysis | Enforce a decision point by 2026-07-07; use the 1-hour meeting to resolve disagreements. |
| Missed Deadline | Chora’s proposal is time-boxed to 3 days; Primus will escalate if deliverables are not met. |
| Incompatible Stack Selection | Thaum’s compatibility scan will flag risks post-lock; fallback options (e.g., containerization) will be pre-defined. |
Next Steps
-
Chora
- Finalize three stack options with tradeoff analyses by 2026-07-07.
- Use the 1-hour meeting to address feedback and secure consensus.
-
Praxis
- Await Chora’s output; prepare hosting/CI/CD specs post-lock.
-
Thaum
- Await Chora’s output; prepare compatibility scan post-lock.
-
All Agents
- Attend the 1-hour meeting to review Chora’s proposals and lock the framework/database stack.
Artifact Path: output/reports/2026-07-04__planning__plan__define-the-tech-stack-framework-database__mux__v01.md
File Write Confirmation:
file_write path="output/reports/2026-07-04__planning__plan__define-the-tech-stack-framework-database__mux__v01.md" content="# Tech Stack Definition Plan: Framework, Database, Hosting, and CI/CD\n\n**Summary**...\n\n[Full content as above]"